In This Article
- Executive Summary
- Why the Question Comes Up at the Clinical Stage
- Gap One: Vendor Sprawl Without a Sponsor-Side Owner
- Gap Two: GxP Systems Nobody Owns
- Gap Three: Inspection Readiness That Depends on Other People’s Files
- Obligations That Arrive With Growth
- Building the Business Case
- The First 90 Days of a Fractional CIO
- When to Hire a Full-Time CIO Instead
- Conclusion
- For Further Reading
- References & Sources
Executive Summary
A clinical-stage biotech can outsource almost every task in a trial, but it cannot outsource the responsibility. FDA regulations let a sponsor transfer obligations to a contract research organization in writing, and ICH E6(R3) keeps the sponsor accountable for the work it outsources while setting stronger expectations for the systems that hold trial data. At the same time, most companies at this stage have no senior person whose job is to own those systems and vendors. The result is a leadership gap that grows with each new study, vendor, and system.
This article makes the business case for filling that gap with a fractional CIO. Biotech leadership teams tend to frame the decision as a question of headcount. We think it is better framed as a question of exposure: which obligations the company already carries, who is accountable for them today, and what it would take to show an inspector or an auditor that someone is in control. Three gaps drive most of that exposure: vendor sprawl, GxP systems with no named owner, and inspection readiness that depends on files held by other companies.
The sections below describe each gap using public regulatory sources, including a 2024 FDA warning letter in which a sponsor’s vendor deleted trial data and audit trails. We then set out how to build and compare the options, what a fractional CIO should deliver in the first 90 days, and the specific events that signal it is time to hire a full-time CIO instead.
Why the Question Comes Up at the Clinical Stage
Early in a biotech’s life, information technology is a short list: laptops, email, file storage, a finance package, and perhaps an electronic lab notebook. An office manager or a managed service provider handles most of it, and that is a reasonable choice. The work is operational, the risks are ordinary business risks, and nothing about it is regulated in the GxP sense (GxP is the shorthand for the good practice regulations, such as good clinical practice and good manufacturing practice, that govern regulated work in life sciences).
That changes when the first IND-enabling work turns into a first-in-human study. Within a year or two, the same company may be running studies that use an electronic data capture (EDC) system, an interactive response technology (IRT) for randomization and drug supply, an electronic trial master file (eTMF), a safety database, electronic clinical outcome assessments (eCOA), a central lab portal, and a quality management system for deviations and CAPA (corrective and preventive action). Most of these belong to vendors. Many were chosen by the CRO. Some were chosen by a clinical operations lead who has since left.
The regulations do not care who chose them. Under 21 CFR 312.50, the sponsor is responsible for selecting qualified investigators, ensuring proper monitoring, and making sure the investigation follows the protocol and the IND.1 Under 21 CFR 312.52, a sponsor may transfer any or all of those obligations to a CRO, but the transfer has to be in writing, and any obligation not described in the writing is treated as not transferred.1 ICH E6(R3), which FDA published as final guidance on September 9, 2025, reinforces the point. As the Association of Clinical Research Professionals summarized it, sponsors remain accountable when they outsource trial activities to CROs or vendors, and the guideline puts more weight on governance, contracts, and ongoing oversight of third parties, as well as data governance, audit trails, and system validation.2
The Gap Is Leadership, Not Labor
Most clinical-stage companies do not need a large IT department. They need someone senior enough to decide which systems the company will rely on, to hold vendors to what was promised, and to answer for the whole picture when an inspector, an auditor, a partner, or the board asks. That is a leadership job. It is also a job that rarely fills forty hours a week at this stage, which is why a full-time CIO hire often feels premature to a CEO and CFO watching the runway.
This is the gap a fractional CIO biotech arrangement is designed to fill: senior judgment on a part-time basis, for a defined scope, with a plan to hand off or scale up as the company grows. Harvard Business Review has described the broader trend, noting that small and medium-sized organizations often struggle to access and afford the senior talent they need, and that part-time senior leaders have become one answer to that problem.3
CIO, CTO, or both? In a biotech, the two titles often blur. We have written separately about the fractional CTO engagement roadmap, which centers on architecture, research computing, and technology strategy. The CIO role described here is narrower and more operational: the business and GxP systems the company relies on, the vendors that run them, the controls that make their records trustworthy, and the evidence that proves it. In a small company, one person may hold both scopes. What matters is that someone holds each one on purpose.
What This Article Adds
Sakara Digital has published on the fractional leadership operating model for Series B biotechs and on when to hire versus contract in a pre-revenue biotech. Those pieces cover governance, reporting lines, and talent strategy across functions. This article stays with one role and one argument: the business case a CEO or CFO would put in front of a board to justify a fractional CIO, built from the obligations the company already carries.
Gap One: Vendor Sprawl Without a Sponsor-Side Owner
Vendor sprawl in a clinical-stage biotech does not usually come from bad decisions. It comes from a series of reasonable ones. Each study adds a CRO, and each CRO brings its preferred EDC and IRT. A partnering deal adds a data transfer. A new indication adds a specialty lab and a new eCOA instrument. A board member recommends a document management tool. Two years later, nobody inside the company can list every system that holds trial data, who has administrator access to each one, or what happens to the data when a contract ends.
The problem is not limited to the sponsor. A Tufts Center for the Study of Drug Development survey of investigative sites, published in Applied Clinical Trials in November 2025, found that sites struggle with the fragmented and poorly coordinated set of solutions that sponsors and CROs require them to use, and that difficulty coordinating technology, time spent troubleshooting, and training were among the leading causes of lost revenue and profit at sites.4 When a sponsor has no single owner for its technology choices, the burden does not disappear. It moves to the sites, the CRO, and eventually the data.
Why Delegation Does Not Remove the Obligation
The same principle applies on the manufacturing side. Under 21 CFR 200.10, FDA regards contract facilities, such as testing laboratories and contract packers, as an extension of the manufacturer’s own facility.5 A clinical-stage company that relies on a contract manufacturer and a contract testing lab for its investigational product is, in FDA’s view, responsible for what happens there. The systems those contractors use to generate and hold batch and test records are part of the company’s own compliance picture, even though the company never logs into them.
On the clinical side, 21 CFR 312.52 is precise about what a transfer to a CRO covers: only the obligations described in writing.1 In practice, many master services agreements and work orders describe clinical tasks well and describe system responsibilities poorly. Who validates the EDC build? Who reviews audit trails? Who approves user access for a sponsor staff member? Who holds the data after database lock, and in what format? If the contract is silent, the answer defaults to the sponsor.
A case from the public record. In a warning letter dated November 27, 2024 and posted in December 2024, FDA described a sponsor inspection of Applied Therapeutics, Inc. The company had used a web-based system to capture certain electronic clinical outcome assessments that measured primary and secondary efficacy endpoints. According to the letter, on March 27, 2024, two days after FDA preannounced an inspection of one of the clinical sites, a third-party vendor contracted by the sponsor deleted electronic data in that system, including the associated audit trails, for all 47 subjects enrolled in the study. FDA cited the sponsor for failing to permit access to records under 21 CFR 312.58 and stated that without the electronic data and audit trails it could not verify the accuracy, consistency, and completeness of the endpoint data.6
The letter is worth reading in full for one detail in particular. The company told FDA that the vendor deleted the data without consulting the sponsor.6 FDA still addressed the letter to the sponsor. The preventive actions the company described in its response are a useful checklist for any clinical-stage company: create a data process map showing where collected data flows and is stored, keep a copy of electronic data held on third-party systems at the sponsor, remove external vendors’ ability to delete files, and maintain audit trails so that any change is identifiable.6 FDA still found the response inadequate because it did not give enough detail on the procedures that would prevent a repeat.6
None of those actions requires deep technical work. Each one requires someone to decide that it matters, write it down, put it in the vendor contract, and check that it happened. That is the core of the vendor sprawl problem, and it is a leadership problem.
What Ownership of the Vendor Portfolio Looks Like
A sponsor-side owner of the vendor portfolio does not need to manage every vendor day to day. Clinical operations, quality, and regulatory will keep their own working relationships. What the owner adds is a single view and a consistent set of expectations:
- A system and vendor inventory that lists every system holding GxP data, the vendor, the study or process it supports, the data it holds, who administers it, and what the contract says about data return and retention.
- Standard contract language for data ownership, audit trail retention, access control, deletion rights, backup, and exit, so that each new work order starts from the same baseline instead of the vendor’s paper.
- A qualification approach proportionate to risk, agreed with quality, so that an eCOA vendor holding primary endpoint data gets more scrutiny than a meeting scheduling tool.
- A consolidation plan that reduces the number of platforms over time, where the company has a choice. The goal is not one vendor for everything. It is fewer handoffs and fewer places for data to go missing.
For a deeper look at how data quality responsibilities break down when several vendors touch the same record, see our article on data quality ownership when three vendors touch one record.
Gap Two: GxP Systems Nobody Owns
The second gap is related but distinct. Even when a company knows what systems it has, it often cannot say who owns each one in the sense the regulations and industry practice expect.
Computerized system practice in life sciences, as reflected in the ISPE GAMP guidance that many companies follow, separates two roles. A process owner is accountable for the business process the system supports and for the data in it. A system owner is accountable for the system’s availability, support, maintenance, security, and change control. In a large company these are named people with written responsibilities. In a clinical-stage biotech they are often nobody, or everybody, which amounts to the same thing.
Validation Is Not a One-Time Event
Many small companies treat validation as a project that ends at go-live. The vendor supplies a validation package, someone signs the summary report, and the binder goes on a shelf. The harder part is what comes after. ISPE’s guidance on the operation of GxP computerized systems makes the point that during the operational life of a system, regulators usually focus on the integrity, consistency, and completeness of the controls needed to keep it compliant.7 That means periodic review, user access review, change control for vendor releases, backup and restore testing, incident handling, and audit trail review. Each of those needs an owner and a schedule.
Software-as-a-service makes this harder, not easier. A multi-tenant vendor may push several releases a year. Each release can change a configuration, a report, or a workflow that a study depends on. If nobody at the sponsor reviews release notes against the validated state, the company can drift out of its validated configuration without anyone noticing until an inspector asks for the change history.
Accountable for the Business Use
Decides how the system supports the process, approves requirements, owns the data, approves who gets access and why, and accepts residual risk. Usually a functional leader in clinical, quality, or regulatory.
Accountable for the System
Keeps the system available, supported, secure, and under change control. Manages the vendor relationship for technical matters, release review, backup, and incident response. This is the role most often left empty.
Independent Oversight
Approves the validation approach, reviews deviations and CAPA, audits vendors, and confirms that the lifecycle controls are followed. Quality oversees the work but should not be the default owner of it.
Accountable for the Whole Portfolio
Makes sure every GxP system has a named process owner and system owner, sets the standards they work to, fills the system owner role directly where no one else can, and reports on the state of the portfolio to leadership.
How the Gap Shows Up
The symptoms are familiar to anyone who has worked in a small sponsor. Former employees still have active accounts in the eTMF. The safety database was validated three versions ago. Quality is asked to approve vendor release notes it does not have the technical background to assess. Clinical operations assumes IT is handling the EDC access review, and the managed service provider assumes clinical operations is. When a question comes up, the answer is “the CRO handles that,” and nobody has checked whether the contract agrees.
A common response is to hand the whole problem to quality. That tends to fail for a simple reason: quality’s job is independent oversight, and a quality team that owns the systems it is supposed to oversee has lost its independence. We have written about how the quality and IT handoff causes most validation delays. In a clinical-stage company, the delay often comes from the fact that there is no IT side to hand off to.
A simple test. Pick the three systems that hold your most important trial data. For each one, ask: who is the named system owner, when was the last periodic review, when was the last user access review, and who approved the last vendor release? If the answers take more than a day to find, or depend on the CRO, the ownership gap is real.
Gap Three: Inspection Readiness That Depends on Other People’s Files
The third gap tends to become visible late, when a marketing application is being prepared and the company starts to think about sponsor inspections. By then, most of the evidence an inspector will ask for already exists or does not, and much of it is held in systems the company does not control.
FDA’s Bioresearch Monitoring (BIMO) program inspects sponsors and CROs as well as clinical investigators. CDER’s BIMO metrics describe the program’s goals as protecting the rights, safety, and welfare of research subjects and verifying the accuracy, reliability, and integrity of clinical trial data submitted to FDA. The same report describes review-based inspections as surveillance inspections conducted in support of marketing application reviews.8 A company that files an NDA or BLA should plan on a sponsor inspection being part of the review.
What Inspectors Have Found at Sponsors
The UK MHRA publishes metrics reports that describe what its good clinical practice inspectors found. Its report for April 2018 to March 2019, issued in February 2021, covered inspections of 8 commercial sponsors among its other inspections. One commercial sponsor received a critical finding because the trial master files selected were incomplete and direct access was not readily provided to all the repositories that made up the TMF, which forced the inspection to proceed mainly through document requests.9 The report noted that this had been a major finding at the organization’s previous inspection and was escalated to critical.9
The same report describes a critical finding at another pharmaceutical company, where the TMFs reviewed were so incomplete that they could not form the basis of the inspection. The observations read like a description of vendor sprawl. For some trials, ancillary systems holding essential trial documents had not been defined as part of the TMF and were not under the same controls. Essential documents retained by vendors were not defined in the TMF plan or index. The quality system did not give an overview of all the systems holding essential documents. And the company lacked effective oversight quality control of its eTMF.9 The report also notes that MHRA includes vendors of electronic systems used in clinical trials within its CRO inspection category, which suggests how closely regulators connect those vendors to the conduct of the trial.9
These findings are from a UK regulator and from several years ago, and the details will differ in an FDA inspection. The pattern is still instructive. Inspectors want to reconstruct what happened in the trial from the records. When the records are spread across systems that the sponsor has not defined, indexed, or controlled, reconstruction fails, and the finding goes to the sponsor.
Readiness Is a Standing Capability, Not a Project
Many companies approach inspection readiness as a campaign that starts a few months before an expected inspection. For the parts of readiness that depend on systems, that is too late. Audit trails cannot be created after the fact. A missing validation record for a system used two years ago cannot be reconstructed with any credibility. A CRO that has already archived a study may take weeks to restore access.
A standing readiness capability for systems looks like this:
- A current inventory that maps each study to every system that holds its data and essential documents, including vendor-held systems.
- For each of those systems, a validation or qualification record the sponsor can produce, and evidence of the controls used during operation: access reviews, change records, and audit trail review where the process calls for it.
- Contract terms and tested procedures for getting inspector access to vendor-held records quickly, including after a study closes.
- A named person who can explain the system landscape to an inspector and answer follow-up questions without a week of email.
For a view on which parts of this work can be automated and which should stay with people, see our article on continuous inspection readiness with AI.
Obligations That Arrive With Growth
The three gaps above exist at almost every clinical-stage company. A second set of obligations arrives on a schedule set by corporate events: an IPO, a change in filer status, or the approach of commercial launch. These are not GxP obligations, but they fall to the same small team, and they often end up with whoever is closest to IT.
Cybersecurity Governance for Public Companies
On July 26, 2023, the SEC adopted rules on cybersecurity risk management, strategy, governance, and incident disclosure for public companies. Under the new Regulation S-K Item 106, registrants must describe in their annual report their processes for assessing, identifying, and managing material risks from cybersecurity threats, the board of directors’ oversight of those risks, and management’s role and expertise in assessing and managing them. Material incidents must be disclosed on Form 8-K under Item 1.05, generally within four business days after the company determines the incident is material.10
For a public clinical-stage biotech, this means the annual report has to say something specific about who in management assesses and manages cyber risk and what expertise they bring. It also means someone must be ready to help the company decide, quickly and defensibly, whether an incident is material. A managed service provider can run security tools. It is not usually positioned to advise the audit committee, own the disclosure narrative, or lead the materiality assessment alongside the general counsel and CFO. A fractional CIO can do those things, provided the scope says so.
Internal Control Over Financial Reporting
Public companies must maintain internal control over financial reporting (ICFR), and information technology general controls, such as access management and change management for financial systems, are part of that. Two SEC accommodations shape when an outside auditor must attest to those controls under Sarbanes-Oxley Section 404(b). Emerging growth companies may skip the 404(b) auditor attestation for up to the first five fiscal years after an IPO, as long as they remain under the revenue threshold, currently less than $1.235 billion, and meet the other conditions.12 Separately, the SEC’s 2020 amendments exclude from the accelerated filer definitions an issuer that is eligible to be a smaller reporting company and had annual revenues of less than $100 million, which means many pre-revenue companies are not required to have an auditor attest to management’s ICFR assessment.11 These issuers still must establish and maintain ICFR and have management assess its effectiveness under Section 404(a).11
The practical point for the business case is timing. A company that loses emerging growth status or starts to generate meaningful revenue can move into 404(b) scope within a fiscal year or two. Building IT general controls that an auditor will test takes time, and the work is much easier if access and change management were designed properly from the start.
Commercial Readiness
As a company approaches approval, a new set of systems appears: enterprise resource planning, serialization and supply chain data exchange, commercial quality processes, and more. Under the Drug Supply Chain Security Act, FDA expects trading partners that do not qualify for its exemptions to meet the enhanced drug distribution security requirements of section 582 of the FD&C Act, and it asks those that cannot to request a waiver, exception, or exemption.13 A company selling its own product will need to work out, well before launch, which of those obligations fall on it and on its partners. These are large, cross-functional programs, and they are one of the clearest signals that the company is outgrowing a fractional model. We return to this in the section on when to hire full time.
| Obligation | What triggers it | What someone must own |
|---|---|---|
| Sponsor oversight of trial systems and vendors | First IND study | System inventory, vendor terms, validation records, access and audit trail controls |
| Contract manufacturing and testing oversight | First GMP batch at a contractor | Clarity on which contractor systems create GMP records and how the company oversees them |
| Sponsor inspection readiness | Marketing application (NDA or BLA) | Reconstructable records across all systems, inspector access to vendor-held data |
| Cyber risk disclosure | Becoming a public company | Risk process, board reporting, incident materiality support |
| ICFR and IT general controls | Public company; 404(b) when filer status changes | Access and change controls for financial systems |
| Commercial supply chain systems | Approval and launch | ERP, serialization, and trading partner data exchange |
Building the Business Case
A business case for a fractional CIO should read like any other investment case: here is the exposure, here are the options, here is what we recommend and why. What makes it different is that the benefits are mostly avoided problems. That makes some leaders uneasy, because it is hard to put a number on a finding that did not happen. We think the better approach is to be concrete about the exposure without inventing figures, and to compare options on what each one can credibly deliver.
Step One: Write Down the Exposure
Start with the obligations the company already carries, using the table above as a prompt. For each one, record who is accountable today, what evidence exists, and what would happen if an inspector, auditor, partner, or acquirer asked about it next month. Be specific. “The CRO handles EDC” is not an answer. “The CRO validated the EDC build under its procedures, our work order does not cover audit trail review or data return, and nobody at the company has reviewed the validation package” is an answer.
Then note the events on the company’s calendar that would test each obligation: a pivotal study start, a planned financing or IPO, a partnering diligence process, a marketing application, an expected pre-approval or sponsor inspection. Exposure that is abstract today becomes very concrete when it is attached to a date.
Step Two: Describe the Consequences in Operational Terms
Avoid dramatic language. Describe what would happen in terms the board already understands:
- Timeline risk. Remediation work discovered during application preparation or diligence competes with the filing itself for the same people.
- Data risk. As the 2024 warning letter shows, when endpoint data or audit trails cannot be produced, FDA may be unable to verify the data that supports the application.6
- Deal risk. Partners and acquirers look at system and data controls during diligence. Gaps become negotiating points or conditions.
- Leadership time. Without an owner, questions about systems and vendors go to the CEO, CFO, head of clinical operations, and head of quality by default, and those are the people with the least time to spare.
Step Three: Compare the Options Honestly
There are five realistic options. Each has a place. The table compares them on what matters for a clinical-stage company. We have deliberately left out fees, because they vary widely and any figure we gave would be a guess. Your own quotes should go in this table when you build it.
| Option | Strengths | Limits at the clinical stage |
|---|---|---|
| Keep the current arrangement | No change, no new spend | Leaves the ownership gaps in place as studies and vendors grow; accountability defaults to people who have other jobs |
| Expand the managed service provider | Good at infrastructure, end-user support, security tooling | Rarely has GxP depth; not positioned to set vendor standards, speak to inspectors, or advise the board |
| Rely on the CRO | Already running the systems for the trial | Covers only what the contract says, only for its own studies, and has its own interests in how systems are run |
| Hire a full-time CIO | Full attention, builds a team, long-term continuity | Often more capacity than the company can use yet; long search; risk of hiring for today’s scope and outgrowing the person, or the reverse |
| Engage a fractional CIO | Senior judgment at the level of time the company needs now; can start quickly; scope can grow or shrink | Limited hours; depends on clear scope, decision rights, and internal owners to carry work between sessions |
The fractional CIO biotech model is strongest when the company’s need is mostly for judgment, standards, and accountability rather than hands-on execution, and when the internal team can carry day-to-day work once the direction is set. It is weakest when the company is about to launch a large, multi-year systems program that needs someone present every day. Our article on what a biotech under 200 people should not build in-house covers the related question of which systems to buy, configure, or build, and what a fractional leader should be asked to decide.
Step Four: Define What Success Looks Like
A business case should say how the board will know the investment worked. For a fractional CIO, useful measures are simple and verifiable:
- Every GxP system has a named process owner and system owner, recorded in a controlled document.
- Every vendor holding GxP data has contract terms covering data ownership, audit trail retention, deletion rights, access, and exit.
- Periodic reviews and access reviews are scheduled and completed on time.
- The company can produce, for any active study, a map of the systems holding its data and the evidence that each one is under control.
- For public companies, the cyber risk process and board reporting described in the annual report match what the company does.
What a good business case avoids. It does not promise that a fractional CIO will prevent every finding, and it does not claim a specific return. It shows the board which obligations exist, who is accountable for them now, which events will test them, and what a named leader will deliver by when. That is a case a board can hold management to.
The First 90 Days of a Fractional CIO
The first three months should produce three things: a clear picture of the current state, a small number of fixes to the highest exposures, and a plan the leadership team has agreed to. The plan below is written for a clinical-stage company with one or more active studies, outsourced manufacturing, and no existing IT leadership beyond a service provider. It is a starting point to adapt, not a fixed method.
Days 1 to 15: Listen and Collect
Meet the CEO, CFO, and the heads of clinical operations, quality, regulatory, and CMC. Ask each one what systems they rely on, what worries them, and what has gone wrong before. Collect contracts, work orders, quality agreements, validation packages, and any prior audit or inspection reports. Agree on decision rights and the reporting line in writing.
Days 15 to 30: Build the Inventory
Create the system and vendor inventory: every system holding GxP data or essential documents, the vendor, the studies or processes it supports, the administrators, the validation status, and what the contract says about data return, retention, deletion, and access. Include vendor-held and CRO-selected systems. This document becomes the basis for everything that follows.
Days 30 to 45: Rank the Exposure
With quality, rank each system by the importance of its data and the strength of its current controls. Systems that hold primary endpoint data, safety data, or batch release records come first. Identify the gaps that could not be closed quickly if an inspector or auditor asked tomorrow.
Days 45 to 60: Close the Urgent Gaps
Fix the items that carry the most exposure and need the least effort: remove former staff from GxP systems, confirm that vendors cannot delete sponsor data without approval, secure a copy of critical vendor-held data at the sponsor, name owners for each high-risk system, and start the first overdue access and periodic reviews.
Days 60 to 75: Set the Standards
Draft the minimum standards the company will hold vendors and system owners to: contract language for data and audit trails, a risk-based qualification approach agreed with quality, a vendor release review process, and a schedule for periodic reviews. Keep them short enough that a small team will follow them.
Days 75 to 90: Agree the Plan and the Cadence
Present a 12-month plan to the leadership team: which gaps close when, which systems will be consolidated or replaced, which events on the corporate calendar the plan is built around, and what the fractional role will cover after the first 90 days. Agree on a standing cadence for reporting to the CEO and, where relevant, the audit committee.
What the Fractional CIO Should Not Do
Scope discipline matters as much as the plan. A fractional CIO should not become the de facto help desk, the person who resets passwords, or the only person who can run a report from the EDC. If the role absorbs hands-on work, the limited hours go to tasks a service provider or an internal coordinator could do, and the leadership work does not get done. The scope should name the internal people who carry day-to-day work, and the fractional leader should spend their hours on decisions, standards, vendor accountability, and the conversations that require seniority.
The fractional CIO should also not replace quality’s independent review. The two roles work closely together, and a good fractional CIO will make quality’s job easier by giving it clear owners, current records, and a single point of contact. But quality must remain able to disagree.
Questions to settle before the engagement starts:
- Who does the fractional CIO report to, and who can overrule a decision on systems or vendors?
- Which decisions can the fractional CIO make alone, and which need approval from the CEO, CFO, or quality?
- Does the scope include acting as system owner for specific systems, or only setting standards for others?
- Will the role brief the audit committee or board on technology and cyber risk?
- Who are the internal owners who carry the work between the fractional leader’s working days?
When to Hire a Full-Time CIO Instead
A fractional arrangement is not meant to last forever, and a good one plans for its own end. The question is not whether the company will need a full-time technology leader, but when. The answer is usually tied to corporate events rather than to headcount alone.
Signals That the Company Is Outgrowing the Model
| Signal | Why it matters |
|---|---|
| A marketing application is in preparation | Sponsor inspection readiness, data traceability, and submission support become daily work for a year or more |
| Commercial launch is being planned | ERP, supply chain, serialization, and commercial systems are large programs with many dependencies and fixed dates |
| Revenue or filer status will move the company into 404(b) scope | IT general controls will be tested by an outside auditor, and remediation must be finished before the test period |
| The company brings manufacturing or testing in-house | Direct ownership of GMP systems, including manufacturing and laboratory systems, adds a scope that needs daily attention |
| An internal IT and systems team exists | Once there are people to manage, develop, and retain, a full-time leader is usually the better choice |
| The fractional leader is consistently over the agreed hours | A sign that the work has become a full-time job; better to plan the transition than let the role stretch |
No single signal settles the question. A company with one of these signals may still be well served by a fractional leader with a larger scope for a period. A company with three or four is almost certainly ready for a full-time hire, and should start the search early, because senior technology leaders with GxP and commercial experience take time to find.
Planning the Handoff
The best time to plan the transition is at the start of the engagement. If the fractional CIO builds the inventory, the standards, the vendor terms, and the reporting cadence as written, controlled documents rather than personal knowledge, the full-time hire starts with a working system instead of a blank page. Useful handoff materials include:
- The system and vendor inventory, with owners, validation status, and contract terms.
- The current exposure ranking and the plan for each open item.
- The standards and procedures the company has adopted, with the reasons behind the main choices.
- A record of decisions made and the alternatives that were rejected.
- An honest view of which vendors are performing and which are not.
Some companies choose to keep the fractional leader involved for a short overlap period, or to have them help assess candidates for the full-time role. Both can help, as long as the new leader’s authority is clear from day one.
The Case for Staying Fractional Longer
Not every company should convert on the first signal. A company with a single asset heading toward a partnering deal rather than its own launch may never need a full-time CIO; the acquirer or partner will bring its own. A company that has consolidated its systems, put strong vendor terms in place, and built a capable internal coordinator may find that a smaller fractional scope, focused on governance and board reporting, meets its needs for some time. The business case should be revisited at each major corporate event, not set once and forgotten.
A useful rule of thumb for boards. If the answer to “who owns our systems and vendors?” is a name, and that person can show the evidence, the arrangement is working, whatever it is called. If the answer is “the CRO” or “we are hiring for that,” the company is carrying exposure that nobody has accepted on purpose.
Conclusion
The case for a fractional CIO in a clinical-stage biotech does not rest on a trend or on a comparison of fees. It rests on a simple observation: the company already carries obligations for the systems and vendors that produce its trial and manufacturing records, and in many companies no senior person is accountable for them. FDA’s regulations, ICH E6(R3), and the inspection record all point the same way. Delegating the work to a CRO or a vendor does not delegate the responsibility, and when a vendor deletes data or a TMF cannot be reconstructed, the finding goes to the sponsor. A fractional CIO gives the company a named owner for that responsibility at the level of time it needs today, with a clear path to a full-time leader when corporate events make one necessary.
Sakara Digital works with pharma and biotech organizations on technology leadership, GxP systems, and vendor oversight, including as a fractional leader where that model fits. If you are weighing how to cover these responsibilities at your company and want an independent view of where your exposure is and what arrangement makes sense, we are happy to have that conversation.
For Further Reading
For Further Reading
- The Fractional CTO Engagement Roadmap for Biotech
- The Fractional Leadership Operating Model for Series B Biotechs
- Talent Strategy for Pre-Revenue Biotech: When to Hire vs. Contract
- What a Biotech Under 200 People Should Not Build In-House
- Data Quality Ownership When Three Vendors Touch One Record
- The Quality and IT Handoff That Causes Most Validation Delays
References & Sources
- Electronic Code of Federal Regulations. “21 CFR Part 312, Subpart D: Responsibilities of Sponsors and Investigators” (including 312.50 General responsibilities of sponsors and 312.52 Transfer of obligations to a contract research organization). https://www.ecfr.gov/current/title-21/chapter-I/subchapter-D/part-312/subpart-D
- Bieze, Beth. “FDA Publishes ICH E6(R3): What it Means for U.S. Clinical Trials.” Association of Clinical Research Professionals, September 16, 2025. https://acrpnet.org/2025/09/16/fda-publishes-ich-e6r3-what-it-means-for-u-s-clinical-trials
- Yokoi, Tomoko, and Amy Bonsall. “How Part-Time Senior Leaders Can Help Your Business.” Harvard Business Review, July 2, 2024. https://hbr.org/2024/07/how-part-time-senior-leaders-can-help-your-business
- Harper, Beth, et al. “Investigative Site Investment, Preparedness, and Experience with Digital Solutions.” Applied Clinical Trials, November 24, 2025. https://www.appliedclinicaltrialsonline.com/view/investigative-site-investment-preparedness-experience-digital-solutions
- Electronic Code of Federal Regulations. “21 CFR 200.10: Contract facilities (including consulting laboratories) utilized as extramural facilities by pharmaceutical manufacturers.” https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-200/subpart-A/section-200.10
- U.S. Food and Drug Administration. “Warning Letter: Applied Therapeutics, Inc., MARCS-CMS 696833.” Center for Drug Evaluation and Research, dated November 27, 2024, posted December 3, 2024. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/applied-therapeutics-inc-696833-12032024
- ISPE. “GAMP Good Practice Guide: Operation of GxP Computerized Systems.” International Society for Pharmaceutical Engineering. https://ispe.org/publications/guidance-documents/gamp-gxp-computerized-systems
- U.S. Food and Drug Administration. “CDER BIMO Metrics, Fiscal Year 2022 (Oct 1, 2021 to Sep 30, 2022).” Office of Scientific Investigations and Office of Study Integrity and Surveillance. https://www.fda.gov/media/156479/download
- Medicines and Healthcare products Regulatory Agency. “GCP Inspections Metrics Report, Metrics Period 1st April 2018 to 31st March 2019.” MHRA GCP Inspectorate, issued February 12, 2021. https://assets.publishing.service.gov.uk/media/602a8e3cd3bf7f03190cbe43/GCP_INSPECTIONS_METRICS_2018-2019_final_12-02-21.pdf
- U.S. Securities and Exchange Commission. “SEC Adopts Rules on Cybersecurity Risk Management, Strategy, Governance, and Incident Disclosure by Public Companies.” Press Release 2023-139, July 26, 2023. https://www.sec.gov/newsroom/press-releases/2023-139
- U.S. Securities and Exchange Commission. “Accelerated Filer and Large Accelerated Filer Definitions.” Small Entity Compliance Guide. https://www.sec.gov/resources-small-businesses/small-business-compliance-guides/accelerated-filer-large-accelerated-filer-definitions
- U.S. Securities and Exchange Commission. “Emerging Growth Companies.” https://www.sec.gov/resources-small-businesses/going-public/emerging-growth-companies
- U.S. Food and Drug Administration. “Exemptions under the Drug Supply Chain Security Act.” https://www.fda.gov/drugs/drug-supply-chain-security-act-dscsa/exemptions-under-drug-supply-chain-security-act








Your perspective matters—join the conversation.