- Executive Summary
- Why Project and Portfolio Decisions Need Their Own AI Rules
- The Accountability Problem With Black-Box Recommendations
- The Tension Between Efficiency and Oversight
- Control One: Require Stated Reasons and Inputs
- Control Two: Record Who Accepted or Overrode the Recommendation
- Control Three: Test the Tool Against Past Decisions
- Control Four: Keep a Named Human Accountable
- Putting the Four Controls Into Practice: A 90-Day Starting Plan
- Conclusion
- For Further Reading
- References & Sources
Executive Summary
Project and portfolio tools now come with AI that flags schedule risk, suggests who should staff a workstream, scores vendors, and ranks the portfolio. In a pharma or biotech company these recommendations shape where money, people, and time go. Yet many of them arrive as a score or a ranking with no reasons attached, and few companies record whether anyone accepted or challenged them. AI accountability in project decisions is the gap between how much these tools influence choices and how little of that influence can be reviewed later.
PMI’s own guidance is clear that AI can inform decisions while people stay accountable for the results. Research on human and AI teams shows why that is harder than it sounds: people often defer to a confident system, and adding a reviewer does not by itself improve decisions. The answer is not to slow every recommendation down. It is to make the important ones reviewable through four controls: require stated reasons and inputs, record who accepted or overrode the recommendation, test the tool against your own past decisions, and keep a named person accountable.
This article explains each control, shows how to scale review effort to the weight of the decision, and closes with a 90-day plan IT and business leaders can start this quarter. The focus is project and portfolio decisions, not GxP product quality decisions, which have their own validation rules.
Why Project and Portfolio Decisions Need Their Own AI Rules
Most AI governance work in life sciences has focused, for good reason, on systems that touch product quality, patient safety, or regulatory submissions. Those systems fall under computerized system validation, and the rules are well understood even when the AI parts are new. Project and portfolio decisions are different. A model that predicts a clinical database lock will slip, or that ranks twelve candidate programs for next year’s budget, is not a GxP system in most companies. It is still making recommendations that move tens of millions of dollars and decide which teams get the people they asked for.
That combination, high influence and low formal control, is the reason this topic deserves its own attention. Nobody has to validate the portfolio ranking tool. Nobody has to keep an audit trail of whether the steering committee followed it. And because these decisions are made in meetings and slide decks rather than in controlled systems, the reasoning behind them often disappears within weeks.
Where AI Already Shows Up in Project Work
Four uses come up again and again in the project management offices of mid-size pharma and biotech companies:
- Schedule risk. Tools that read task histories, status updates, and dependency networks to estimate the chance that a milestone will slip, and by how much.
- Resource allocation. Tools that suggest which people or teams should be assigned to a workstream based on skills, availability, and past performance.
- Vendor scoring. Tools that rank CROs, CDMOs, software suppliers, or consultants based on proposal content, past delivery data, and risk signals.
- Portfolio prioritization. Tools that rank programs or initiatives by expected value, strategic fit, risk, and resource demand, and suggest what to fund, pause, or stop.
PMI’s research shows how quickly this has spread. Its 2023 report on AI in project management found that 21 percent of respondents were using AI and that 82 percent of senior leaders said AI would affect their projects.2 By its third global study, run between July and September 2024 with 2,000 project professionals across 12 countries and 18 industry sectors, PMI was advising practitioners to move past basic tasks. Its report tells project professionals to “Focus on mastering complex applications like cost management and decision support, as these yield the highest productivity gains.”3
The trend is clear. In 2019, Gartner predicted that by 2030, 80 percent of the work of the project management discipline would be eliminated as AI took over data collection, tracking, and reporting.4 Whether or not that figure holds, the pressure is toward letting the tools do more of the analysis, and decision support is where PMI says the largest gains are.
Not GxP, and Still Not Low Stakes
It is worth being precise about scope. When a model helps decide whether a batch is released, whether a deviation is closed, or how a safety signal is assessed, that is a GxP decision. It needs validation, an audit trail, and the controls described in 21 CFR Part 11 and EU GMP Annex 11. This article is not about those decisions.
It is about the decisions around them: which program gets funded, which vendor wins the bid, which team is staffed on the filing, and how much contingency to hold on the launch schedule. These decisions are not inspected by FDA. They are reviewed by boards, audit committees, partners, and investors, and sometimes by courts. When a biotech misses a launch date because a schedule model understated risk, or terminates a program on the strength of a ranking no one can reconstruct, the question “who decided this, and on what basis?” will be asked. The company should be able to answer it.
What PMI Says About Accountability
PMI has now said this plainly. In July 2026, writing about PMI’s new Standard for Artificial Intelligence in Portfolio, Program, and Project Management, Kathleen Walch put the principle in one sentence: “AI can inform decisions, but people must interpret its outputs and remain accountable for the consequences.”1 The same post observes that “In many organizations, human oversight of AI is reactive,” with someone checking a recommendation only when it looks questionable. It calls for points where human judgment is mandated, escalation paths when outputs are uncertain or incomplete, and clarity on who is accountable for decisions informed by AI.1
That is the right principle. The rest of this article is about how to make it hold up in practice, when the tool is a black box, the steering committee is busy, and the recommendation looks reasonable.
The Accountability Problem With Black-Box Recommendations
A recommendation is reviewable when someone other than the person who accepted it can later see what was recommended, why, on what data, and what the decision maker did with it. Most AI features in project tools fail at least two of these tests.
What “Black Box” Means in a Project Tool
In this context, a black box is not only a complex neural network. It is any recommendation whose reasoning the user cannot see or check. A vendor score of 78 out of 100 with no breakdown is a black box. A red schedule risk flag with no list of the tasks driving it is a black box. A portfolio ranking produced by a general-purpose language model that read a folder of business cases is a black box, even if the model will produce a plausible paragraph explaining itself when asked, because that paragraph may not reflect how the ranking was produced.
The distinction matters because the fix depends on it. Some tools could show their reasoning and simply do not by default. Others cannot, because the underlying method does not produce reasons that map to anything a project leader would recognize.
The Human Who Takes the Blame
When a black-box recommendation goes wrong, the person who accepted it usually carries the responsibility, even if they had no practical way to check it. The researcher Madeleine Clare Elish studied this pattern in accidents involving automated systems. She described how “responsibility for an action may be misattributed to a human actor who had limited control over the behavior of an automated or autonomous system,” and named the pattern a moral crumple zone.9
The project version is easy to picture. A portfolio tool ranks a program low. The committee stops it. A year later a competitor shows the mechanism worked. The board asks why the program was stopped, and the answer is that the portfolio director accepted the ranking. The director could not see the ranking’s inputs, did not know it weighted a market-size estimate that was three years old, and had forty minutes on the agenda for twelve programs. Responsibility rests on the person, while the system that shaped the choice escapes review. Accountability that works has to give the accountable person the means to check what they are signing.
Why Explanations Alone Do Not Fix It
The obvious response is to demand explanations. That helps, but less than many leaders assume, and the research is worth knowing before writing a requirement into a contract.
Cynthia Rudin argued in Nature Machine Intelligence that for high-stakes decisions, trying to explain black-box models after the fact is likely to perpetuate bad practice, and that the better path is to use models that are interpretable in the first place.6 Her point for buyers is that a post-hoc explanation is a second model describing the first, and it can be wrong.
Experimental work adds a second warning. In a set of preregistered experiments with 3,800 participants, Poursabzi-Sangdeh and colleagues compared people using a transparent model with few features against people using a black box. The transparent model did not make people follow its good predictions more closely. Worse, “showing participants a clear model meant that they were less able to detect and correct for the model’s sizable mistakes, seemingly due to information overload.”7
The practical lesson: more information on the screen is not the same as a reviewable recommendation. A twenty-factor breakdown that nobody reads gives the appearance of transparency without the substance. What a reviewer needs is a short statement of the main reasons, the inputs those reasons came from, and a way to check them. The controls below are built around that, not around maximum disclosure.
The Tension Between Efficiency and Oversight
Every control in this article adds work. Leaders adopt AI in project tools to save time, and asking people to document reasons, record overrides, and run tests seems to give some of that time back. That tension is real, and it should be faced directly rather than dismissed.
What the Evidence Says About Human and AI Teams
The most useful evidence comes from a 2024 meta-analysis in Nature Human Behaviour by Michelle Vaccaro, Abdullah Almaatouq, and Thomas Malone at MIT. They reviewed 106 experimental studies with 370 effect sizes, each comparing humans alone, AI alone, and humans working with AI. On average, the human and AI combinations performed significantly worse than the better of the two working alone (Hedges’ g of negative 0.23). The losses showed up in tasks that involved making decisions, while tasks that involved creating content showed gains. And when the AI alone outperformed the humans alone, combining them tended to produce losses.5
For project leaders, this finding needs careful reading. It does not say AI recommendations are bad. It says that putting a person next to a recommendation does not automatically produce a better decision than either would make alone. Sometimes the person adds judgment the model lacks. Sometimes the person overrides a good recommendation for weak reasons, or accepts a bad one without looking. Simply adding a reviewer is not oversight. Oversight is a reviewer who has the information, time, and standing to add something.
Automation Bias Is a Named Risk
The tendency to over-rely on a system’s output is common enough that European law names it. Article 14 of the EU AI Act, which covers human oversight of high-risk systems, requires that the people assigned to oversight be enabled to stay aware of the possible tendency to rely or over-rely on the output of a high-risk system. The Act calls this automation bias and singles out systems that provide information or recommendations for decisions to be taken by people.14 Most project tools are not high-risk systems under the Act (more on the exception below), but the definition is useful anywhere: a recommendation tool creates a predictable tendency toward agreement, and good oversight design works against it.
When Oversight Becomes a Formality
The researcher Ben Green surveyed 41 policies that require human oversight of government algorithms. He found two flaws. First, evidence suggests people often cannot perform the oversight those policies expect. Second, because of that, the policies can legitimize faulty algorithms. In his words, “human oversight policies provide a false sense of security in adopting algorithms.”8 His proposed fix is to move from relying on individual reviewers to institutional oversight, where the organization must justify the use of the algorithm and show evidence that its proposed oversight works.
Green wrote about government, but the point carries to a portfolio committee. A rule that says “a human must approve all AI recommendations” is easy to write and easy to satisfy with a click. The four controls in this article are designed to be institutional in Green’s sense: they create records and tests the organization can check, rather than resting entirely on one reviewer’s diligence.
Scaling Review to the Weight of the Decision
The way through the efficiency tension is proportion. PMI’s 2023 report put the principle simply: “The more complex the task, the more human intervention needed.”2 Not every AI suggestion needs a decision record. A tool that proposes a meeting time or drafts a status summary needs none. A tool that recommends stopping a program needs the full set. The table below shows one way to tier decisions so that review effort goes where it matters.
| Tier | Example AI Recommendations | What Review Looks Like |
|---|---|---|
| Tier 1: Routine | Draft status reports, meeting summaries, task reminders, minor date adjustments within float | User checks before sharing. No decision record. Spot checks only. |
| Tier 2: Operational | Schedule risk flags on a single project, suggested staffing for a workstream, ranking of short-listed vendors for a small contract | Stated reasons required. Accept or override recorded in the project tool with a one-line reason. Quarterly sample review. |
| Tier 3: Significant | Vendor selection for a pivotal CRO or CDMO contract, resourcing across programs, contingency for a filing or launch date | Stated reasons and inputs reviewed before the decision. Full decision record. Named accountable owner. Tool tested against past decisions before first use. |
| Tier 4: Strategic | Portfolio ranking, program stop or go, annual budget allocation across therapeutic areas | All Tier 3 controls plus independent challenge from someone outside the team that prepared the recommendation, and a written rationale that stands on its own without the tool’s output. |
Most companies will find that only a small share of AI recommendations fall into Tiers 3 and 4. That is the point. The burden of oversight should be concentrated on the few decisions where a mistake would be expensive and hard to undo.
Control One: Require Stated Reasons and Inputs
The first control is the simplest to state: for any Tier 2 recommendation or above, the tool or the person presenting it must say why, and on what data. A score without reasons does not go to a decision meeting.
What a Reviewable Recommendation Contains
The guidance on explaining AI decisions published by the UK Information Commissioner’s Office and The Alan Turing Institute is written for decisions about individuals, and the ICO notes it is under review following the Data (Use and Access) Act. Its structure is still a practical starting point for any recommendation. It identifies six types of explanation, including a rationale explanation, defined as “the reasons that led to a decision, delivered in an accessible and non-technical way,” a responsibility explanation covering who is involved and who to contact for human review, and a data explanation covering what data was used and how.13 Four of these map directly onto project decisions.
Why This Recommendation
The two to five factors that drove the result, in plain language. For a schedule risk flag: the specific tasks, dependencies, or historical patterns behind it. For a vendor score: which criteria pulled the score up or down.
What It Was Based On
The inputs, their sources, and their dates. Which project plans, which timesheets, which vendor performance records, which market estimates. Stale or missing inputs should be flagged, not hidden.
Who Owns It
Who configured the tool, who maintains the inputs, who presented the recommendation, and who is accountable for the decision it informs. Named people, not departments.
How Reliable It Has Been
How the tool has performed on past decisions of this type, and where it is known to be weak. A schedule model that has never seen a regulatory filing should say so.
Questions to Ask a Vendor Before You Buy
Many AI features in project tools arrive as part of a platform upgrade rather than a separate purchase, which means nobody evaluates them. For Tier 3 and 4 uses, ask the vendor directly:
- Can the tool show the main factors behind each recommendation, and do those factors come from the method that produced the result, or from a separate explanation step?
- Can we see and export the inputs used for a given recommendation, with their dates?
- Does the tool store each recommendation as it was presented, so we can see later what the committee saw, even after the inputs change?
- Can we configure or at least see the weights given to each criterion in a scoring or ranking model?
- What testing has the vendor done on decisions like ours, and will they share the results?
- If the feature uses a general-purpose language model, how does the vendor handle the same question producing different answers on different days?
Rudin’s argument is relevant here. For scoring and ranking, an interpretable method (a weighted scorecard whose weights the committee has agreed, or a simple statistical model of slippage) is often available and often good enough.6 If a vendor’s black-box ranking is only slightly better than a transparent scorecard on your own data, the transparent one is usually the better choice for a Tier 4 decision, because people can argue with it.
When the Tool Cannot Explain Itself
Some useful tools will not meet this bar. A language model that summarizes forty business cases and suggests a ranking may be a good starting point for discussion, but it cannot give reliable reasons for its ordering. In that case the control shifts to the person. The program lead or portfolio analyst who brings the ranking forward must state, in their own words, the reasons they find persuasive and the inputs those reasons rest on. If they cannot, the ranking is a prompt for discussion, not a recommendation, and it should be labeled that way in the decision materials.
A simple test for Tier 3 and 4 materials: remove the AI output from the slide and read what is left. If the rationale still stands on its own, the decision is reviewable. If the only reason given is that the tool ranked it first, it is not.
Control Two: Record Who Accepted or Overrode the Recommendation
The second control creates the evidence. If no one records what the tool recommended and what the decision maker did, there is no way to know later whether the tool was followed, whether it was right, or whether the people overriding it were adding value. The record does not need to be elaborate. It needs to exist.
The Minimum Decision Record
For Tier 3 and 4 decisions, the record below covers what a board member, auditor, or new portfolio head would need to reconstruct the choice. Tier 2 decisions can use a shorter version: the recommendation, accept or override, and a one-line reason.
| Field | What to Capture | Why It Matters |
|---|---|---|
| Decision and date | What was decided, by which forum, on what date | Anchors the record to the meeting minutes |
| AI recommendation as presented | The score, ranking, or flag exactly as the decision makers saw it, saved as a snapshot | Tools and inputs change; the snapshot shows what was in front of people |
| Tool and version | Which tool, which configuration, which model version if known | Lets you connect outcomes back to a specific setup |
| Stated reasons and key inputs | The rationale and data explanation from Control One | Shows what the recommendation rested on |
| Action taken | Accepted, modified, or overridden | The core of the record; makes follow and override rates measurable |
| Reason for the action | Short plain-language reason, required for overrides and modifications, encouraged for acceptance | Captures the human judgment the tool lacked |
| Accountable owner | The named person accountable for the decision | Prevents accountability from spreading across a committee |
| Review date | When the outcome will be checked | Feeds the testing described in Control Three |
Overrides Are Information, Not Defiance
Culture matters here. In some companies, overriding the tool feels like a confession that you know better than the data, and people stop doing it. Avoid that. An override with a clear reason is exactly the judgment PMI’s guidance asks people to bring. Walch’s post describes human oversight as more than a safeguard, because project professionals bring the context, institutional knowledge, and stakeholder understanding that turn AI-generated options into sound decisions.1
The record also protects the person. If a director overrides a schedule risk flag because they know the vendor has added a second shift, and writes that down, the record shows a reasoned choice. If the project slips anyway, the review is about whether the reasoning was sound, not about who ignored the computer.
Over time, the pattern of overrides tells you something no single decision can. If one team overrides the resourcing tool 60 percent of the time, either the tool does not fit that team’s work or the team does not trust it. Both are worth knowing. If nobody ever overrides anything, that is a warning sign too, because it suggests the review step has become a formality.
Where the Record Should Live
The best place is inside the tool that produced the recommendation, if it supports capturing the decision and reason alongside a frozen copy of the output. The next best is the governance system the company already uses for decisions of that weight, such as the portfolio committee’s decision log or the stage-gate record. Avoid creating a separate AI decision register that nobody opens. The record should be kept with the decision, so that anyone looking at the decision also sees the AI’s part in it.
Keep the record for as long as the company keeps other records of that decision. For portfolio decisions that may later matter to a partnering discussion, an acquisition, or litigation, that is usually years, not months.
Control Three: Test the Tool Against Past Decisions
The third control answers the question every steering committee should ask before trusting a new tool: how would it have done on decisions we have already made, where we know what happened?
Learning From Banking’s Outcomes Analysis
Banking regulators have required something like this for years. The current interagency guidance from the Federal Reserve, FDIC, and OCC, issued as SR 26-2 on April 17, 2026, replaced the long-standing SR 11-7. It describes outcomes analysis as follows: “Outcomes analysis compares model outputs to corresponding real-world outcomes to assess model performance relative to model objectives and business use.” When this analysis shows material errors or persistent deviations, the guidance says adjustment, recalibration, or redevelopment may be warranted.10
Two caveats apply. SR 26-2 governs banks, not pharma companies, and it explicitly places generative and agentic AI models outside its scope, while applying to traditional statistical models and non-generative AI.10 The point here is not that the guidance applies to you. It is that an industry with long experience of models driving money decisions settled on comparing outputs with real outcomes as a basic test. Project and portfolio tools deserve the same treatment.
Project management has its own version of this idea. Bent Flyvbjerg’s work on reference class forecasting, published in Project Management Journal, argued that forecasts become more accurate when based “on actual performance in a reference class of comparable projects,” which bypasses both optimism bias and strategic misrepresentation.11 Your own project history is a reference class. It is also the best test set you have for an AI tool that claims to predict schedule risk or rank programs.
Designing a Back-Test on Your Own History
Pick Decisions With Known Outcomes
Choose 20 to 40 past decisions of the type the tool will support: completed projects with known slippage, vendors whose delivery you can now judge, programs whose fate you know. Include failures as well as successes, and include decisions your teams got wrong.
Rebuild the Inputs as They Were
Give the tool only the information that was available at the time of each decision. A schedule model tested on plans that already include the eventual delays will look far better than it is. This step takes the most effort and matters the most.
Compare Three Answers
For each decision, compare what the tool would have recommended, what the team decided, and what happened. The question is not only whether the tool was right, but whether it was right more often than the people, and on which kinds of decisions.
Look for Patterns in the Misses
Where the tool was wrong, look for a pattern. Does it underestimate risk on first-in-class programs? Does it favor large vendors? Does it miss slippage on projects with external regulatory dependencies? These patterns become the known limitations stated with each recommendation.
Write Down What You Found and Decide the Tier
Record the results and decide which decision tiers the tool may support. A tool that does well on operational schedule risk but poorly on portfolio ranking can be approved for one and not the other.
What the Results Should Change
The Vaccaro meta-analysis gives a useful frame for reading the results. It found that when humans outperformed AI alone, combining them produced gains, and when AI outperformed humans alone, combining them produced losses.5 The study did not test project tools, but the practical reading for a back-test is clear. If your back-test shows the tool beats your teams on a decision type, the main risk is people overriding it for weak reasons, so require stronger reasons for overrides. If your teams beat the tool, the main risk is people deferring to it, so require stronger reasons for acceptance. If neither is clearly better, use the tool as one input among several and do not let its output stand in for the rationale.
Testing Again After Changes
A back-test is a snapshot. Vendors update models, companies change how they plan, and the portfolio shifts. Repeat the test when the vendor makes a significant model change, when you change the inputs the tool reads, and at least once a year for Tier 3 and 4 uses. Then add the outcomes from your decision records (Control Two) to the test set. After a year or two, the company has its own evidence on how well the tool works, which is far more useful than any vendor claim.
A note on small portfolios: a biotech with eight programs cannot run a statistically strong back-test on portfolio ranking. That is a reason for caution, not a reason to skip the test. Run it on the decisions you have, treat the results as directional, and give the tool a lower tier until your own track record grows. A small sample is still better evidence than a vendor demonstration on someone else’s data.
Control Four: Keep a Named Human Accountable
The fourth control connects the other three. Every Tier 3 and 4 decision informed by AI needs one named person who is accountable for it, who has seen the reasons and inputs, and who has the standing to reject the recommendation.
Accountability Is a Role, Not a Click
A committee cannot be accountable in a useful sense, and neither can a tool. When a portfolio decision is recorded as “approved by the portfolio review board on the basis of the prioritization model,” nobody is accountable. Naming a person changes how they engage. The program head who knows their name is on the record of a resourcing decision will ask harder questions about the inputs than one who is one of nine votes.
This also answers the moral crumple zone problem described earlier. Accountability is fair when the accountable person has the means to check what they approve. Controls One through Three give them that: stated reasons, the record of what the tool has done before, and evidence of how reliable it is. Without those, naming a person only identifies who will take the blame.
Borrowing the Idea of Effective Challenge
SR 26-2 again offers a useful model. It describes “effective challenge” as “the critical analysis conducted by objective experts who evaluate model risk and effect appropriate changes throughout the model lifecycle.” It says the people doing this need appropriate expertise, enough independence to stay objective, and the organizational standing and influence to bring about change.10
Those three conditions are a good test for anyone reviewing a Tier 4 recommendation. A junior analyst who built the model inputs has expertise but not independence. A finance partner from outside the program has independence but may lack the expertise to judge a clinical timeline. A board observer has standing but no time. For the decisions that matter most, find someone who has all three, even if only for the one meeting where the recommendation is decided.
Questions the Accountable Person Should Ask
Daniel Kahneman, Dan Lovallo, and Olivier Sibony wrote in Harvard Business Review that for important decisions, executives need to conduct a careful review “not only of the content of recommendations but of the recommendation process,” and offered a 12-question checklist for doing it.12 Their checklist was built for recommendations from human teams, but the idea fits AI recommendations well. Adapted for a project or portfolio tool, the accountable person should ask:
- What are the main reasons for this recommendation, and do I find them persuasive on their own?
- What inputs did it use, how old are they, and is anything important missing?
- How has this tool performed on past decisions like this one, and is this a case where it is known to be weak?
- What alternatives were considered, and why did the tool rank them lower?
- Did the team that prepared the materials have any reason to prefer this answer before the tool produced it?
- If I override this, what is my reason, and will I write it down?
- If I accept it and it turns out wrong, could I explain to the board why accepting it was reasonable?
When Resource Allocation Touches Employment Rules
One category deserves a specific flag for companies with staff in the EU. The EU AI Act lists AI used in employment and management of workers among its high-risk use cases. Annex III, point 4(b), covers AI systems intended to make decisions affecting work relationships, to allocate tasks based on individual behavior or personal traits or characteristics, or to monitor and evaluate the performance and behavior of people in those relationships.15
A resource allocation tool that suggests which named employees should staff a project based on their past performance or personal characteristics may fall within that description. The timing has changed: according to the European Commission, following the AI Omnibus amendment that entered into force on 27 July 2026, the rules for these Annex III high-risk use cases will apply from 2 December 2027.16 That gives companies time, but not a lot of it. If your resourcing tool assigns work to individuals rather than to roles or teams, ask your legal team now whether it falls in scope, and if it might, expect the Act’s human oversight duties, including the automation bias awareness in Article 14, to apply to it.14
Do not assume the vendor has handled this. Under the AI Act, deployers of high-risk systems carry their own obligations, including human oversight and monitoring. The European Commission’s summary of the Act states that deployers ensure human oversight and monitoring once a system is on the market.16 A resourcing feature switched on inside a project platform can make your company a deployer without anyone in IT noticing.
Putting the Four Controls Into Practice: A 90-Day Starting Plan
None of these controls require a new platform or a large program. They require decisions about scope, a few changes to how decision materials are prepared, and some time from people who know your project history. A practical 90-day start looks like this.
Weeks 1 to 3: Find the AI Already in Use
List every AI feature that produces recommendations in your project, portfolio, resource, and vendor management tools, including features that arrived in platform upgrades. For each one, note what it recommends, who sees the output, and which decisions it influences. Many leaders are surprised by how long this list is.
Weeks 3 to 5: Assign Tiers
Place each use into one of the four tiers. Be honest about how outputs are used in practice, not how the vendor describes them. A schedule risk dashboard that the portfolio committee looks at before funding decisions is a Tier 4 input, even if it was bought as a Tier 2 tool.
Weeks 5 to 8: Set Up Records and Reasons for Tier 3 and 4
Agree the minimum decision record and where it will live. Update the templates for portfolio and steering committee materials so that any AI output comes with stated reasons and inputs, and so the rationale stands without it. Name the accountable owner for each recurring decision type.
Weeks 6 to 12: Run One Back-Test
Pick the Tier 3 or 4 tool with the most influence and run a back-test on past decisions with known outcomes. Use the results to set its tier, write down its known limits, and decide whether overrides or acceptances need the stronger reasons.
Week 12: Review and Decide What Comes Next
Look at the first decision records. Are reasons being captured? Are overrides happening, and are they reasoned? Is anyone using the records? Adjust the templates, then extend the back-testing to the next tool on the list.
Fitting This Into Existing Governance
These controls should not create a parallel governance structure. The US Government Accountability Office’s AI accountability framework organizes its practices around four principles: governance, data, performance, and monitoring.17 The four controls here map onto that structure. Named accountability is governance. Stated inputs are data. Back-testing is performance. Decision records and periodic retesting are monitoring. If your company already has an AI governance committee or a policy built on a similar structure, extend it to cover project and portfolio tools rather than writing a separate one.
The project management office is usually the right owner. It already runs the stage-gate process, maintains the decision log, and holds the project history needed for back-testing. PMI’s July 2026 post makes the same point from the other direction: AI does not fix broken processes. “It often amplifies them.”1 A PMO with clear decision rights and good records is the best place to make AI recommendations reviewable. A PMO without them should fix that first.
Signs the controls are working:
- Tier 3 and 4 decision materials state reasons that make sense without the AI output.
- The override rate for each tool is known, and it is neither zero nor erratic.
- Overrides come with reasons that someone else could evaluate.
- Each important tool has a written back-test result and a stated list of known limitations.
- When the board or an acquirer asks why a decision was made, someone can answer in an afternoon, not a month.
Common Objections and Short Answers
“This will slow us down.” For Tier 1 and 2 uses, it barely changes anything. For Tier 3 and 4 decisions, the extra effort is a short paragraph of reasons and a few fields in a log, set against decisions worth millions. The meta-analysis evidence suggests that unstructured human review of AI decisions can make results worse, so the choice is not between speed and quality. It is between structured review and the appearance of review.
“The vendor will not show us how the model works.” Then the tool is limited to lower tiers, or the person presenting its output must supply the reasons themselves. Make explanation capability a selection criterion the next time the contract comes up.
“We do not have enough history to test against.” Use what you have and treat the result as directional. Start capturing decision records now, and in a year you will have a test set built from your own decisions.
“Nobody will read the records.” Someone should, and that is a design choice. Build a quarterly review of override patterns into the PMO’s routine, and use the records when running the annual back-test. Records that feed a regular review get kept up. Records that do not are abandoned.
Conclusion
AI recommendations in project and portfolio management are not going away, and they should not. Used well, a schedule risk model catches problems earlier than a busy program lead, and a vendor scoring tool brings consistency to a process that is often driven by relationships. The trouble is not the recommendations. It is that many of them arrive as unexplained numbers, influence decisions without leaving a trace, and are never checked against what happened. That combination leaves the company unable to say why it made its most important choices, and leaves the people who approved them carrying responsibility they could not exercise. The four controls described here (stated reasons and inputs, a record of acceptance or override, testing against past decisions, and a named accountable owner) fix that without slowing routine work, because review effort is concentrated on the few decisions that matter most.
Sakara Digital works with pharma and biotech organizations on the governance, data, and process work that makes AI tools trustworthy in practice, including the project and portfolio decisions that fall outside formal validation. If you are adding AI to your PMO or portfolio process and want an independent perspective on where review effort should go, we are happy to have that conversation.
For Further Reading
For Further Reading
- Human-in-the-Loop Requirements for Pharma AI: What FDA and EMA Actually Expect
- Context Graphs for Regulatory Decision Traceability: Why Pharma Needs This Now
- Application Portfolio Rationalization Post-Merger: A 6-Month Playbook
- Vendor Risk Management for AI-Enabled Pharma Services
- Code Without Compassion, Part 2: When Algorithms Manage Humans
References & Sources
- Walch, Kathleen. “The New AI Standard: A Shared Foundation for Responsible Adoption.” PMI Blog, Project Management Institute, July 14, 2026. https://www.pmi.org/blog/pmi-ai-standard-project-management
- Project Management Institute. “Shaping the Future of Project Management With AI.” PMI Thought Leadership report, October 2023. https://www.pmi.org/learning/thought-leadership/shaping-the-future-of-project-management-with-ai
- Project Management Institute. “The Project Professional’s GenAI Journey: From Quick Wins to Leading the Transformation.” PMI, 2025 (survey fielded July to September 2024, n=2,000). https://www.pmi.org/-/media/pmi/documents/public/pdf/learning/thought-leadership/pmi-genai-journey-report.pdf
- Gartner, Inc. “Gartner Says 80 Percent of Today’s Project Management Tasks Will Be Eliminated by 2030 as Artificial Intelligence Takes Over.” Press release, March 20, 2019. https://www.gartner.com/en/newsroom/press-releases/2019-03-20-gartner-says-80-percent-of-today-s-project-management
- Vaccaro, Michelle, Abdullah Almaatouq, and Thomas Malone. “When Combinations of Humans and AI Are Useful: A Systematic Review and Meta-Analysis.” Nature Human Behaviour 8, no. 12 (2024): 2293–2303. https://www.nature.com/articles/s41562-024-02024-1
- Rudin, Cynthia. “Stop Explaining Black Box Machine Learning Models for High Stakes Decisions and Use Interpretable Models Instead.” Nature Machine Intelligence 1, no. 5 (May 2019): 206–215. https://www.nature.com/articles/s42256-019-0048-x
- Poursabzi-Sangdeh, Forough, Daniel G. Goldstein, Jake M. Hofman, and Jennifer Wortman Vaughan. “Manipulating and Measuring Model Interpretability.” arXiv:1802.07810, 2018 (revised 2021). https://arxiv.org/abs/1802.07810
- Green, Ben. “The Flaws of Policies Requiring Human Oversight of Government Algorithms.” Computer Law & Security Review 45 (2022). arXiv:2109.05067. https://arxiv.org/abs/2109.05067
- Elish, Madeleine Clare. “Moral Crumple Zones: Cautionary Tales in Human-Robot Interaction.” Engaging Science, Technology, and Society 5 (2019): 40–60. https://estsjournal.org/index.php/ests/article/view/260
- Board of Governors of the Federal Reserve System, Federal Deposit Insurance Corporation, and Office of the Comptroller of the Currency. “Supervisory Guidance on Model Risk Management.” Attachment to SR Letter 26-2, April 17, 2026. https://www.federalreserve.gov/supervisionreg/srletters/SR2602a1.pdf
- Flyvbjerg, Bent. “From Nobel Prize to Project Management: Getting Risks Right.” Project Management Journal 37, no. 3 (August 2006): 5–15. arXiv:1302.3642. https://arxiv.org/abs/1302.3642
- Kahneman, Daniel, Dan Lovallo, and Olivier Sibony. “The Big Idea: Before You Make That Big Decision.” Harvard Business Review, June 2011. https://hbr.org/2011/06/the-big-idea-before-you-make-that-big-decision
- Information Commissioner’s Office and The Alan Turing Institute. “Explaining Decisions Made With AI, Part 1: What Goes Into an Explanation?” ICO guidance (noted by the ICO as under review). https://ico.org.uk/for-organisations/uk-gdpr-guidance-and-resources/artificial-intelligence/explaining-decisions-made-with-artificial-intelligence/part-1-the-basics-of-explaining-ai/what-goes-into-an-explanation/
- Regulation (EU) 2024/1689 (Artificial Intelligence Act), Article 14: Human Oversight. Text as reproduced by the EU Artificial Intelligence Act website. https://artificialintelligenceact.eu/article/14/
- Regulation (EU) 2024/1689 (Artificial Intelligence Act), Annex III: High-Risk AI Systems Referred to in Article 6(2). Text as reproduced by the EU Artificial Intelligence Act website. https://artificialintelligenceact.eu/annex/3/
- European Commission. “AI Act.” Shaping Europe’s Digital Future, regulatory framework page (accessed October 2026). https://digital-strategy.ec.europa.eu/en/policies/regulatory-framework-ai
- US Government Accountability Office. “Artificial Intelligence: An Accountability Framework for Federal Agencies and Other Entities.” GAO-21-519SP, June 30, 2021. https://www.gao.gov/products/gao-21-519sp